This page tracks the remodeling of the kitchen of the Plouhinec house.
The final kitchen will occupy both the space of the existing kitchen and a portion of the back of the cottage, visible in the demolition photos at the bottom of this post.
Here is the floor plan.
Demolition in progress. The end wall will be demolished, joining this space to the existing kitchen on the other side of the wall. The gap between the floor and wall, visible a the bottom right was filled with concrete on 7 February, 2017. See the bathroom post for pictures of that.
2013, pictures of the original space.
The final kitchen will occupy both the space of the existing kitchen and a portion of the back of the cottage, visible in the demolition photos at the bottom of this post.
Here is the floor plan.
From lt. to rt., pantry, fridge, cooktop/oven, sink, dishwasher, combined undercounter washer/dryer |
Kitchen elevation |
2013, pictures of the original space.
The kitchen will straddle the salon and the dining room, making for a nice open circular flow to the main floor.
ReplyDelete